Project Details

Honesty, integrity and reliability are the family qualities that support our award-winning business.

Hallmark Entertainment


Contractor | Centerre
Owner | Hallmark Entertainment
Architect | Aspen Engineering
Engineer | Matsuo
Delivery Method | Design Assist

Project Highlights
  • Fast track, 7-month completion of an International Broadcast Facility.
  • Completed on the 4th floor of an existing core and shell building.
  • Installation of two (2) new 1,000-amp services.
  • Installation of two (2) new pit installed paralleled 750-kw generators.
  • Installation of two (2) UPS’s and six (6) PDU’s.
  • Included all under floor equipment whips, grounding, and alarm and detection systems.
  • Every circuit in the facility is redundant and monitored by a site scan system.