Property Type: Advanced Industries
Contractor | Greiner Electric/Madison Communications
Owner | Z-Colo
Architect | NA
Engineer | KEA Engineers
Design Method | Negotiated
Project Highlights
- Expansion of an Active Co-Locating facility hosting Fortune 1000 companies like Google and Apple
- Fast Track 18-week schedule with rolling 24-hour shifts
- Modification of existing equipment while maintaining power to facility
- Installation of a new 2000-kw generator on roof of 30 year-old building
- Installation of two (2) 1000-kW UPS systems
- Installation of two (2) 3000-Amp Automatic Transfer Switches
- Installation of new apparatus with Kirk Key Interlock