Contractor: Mortenson Construction Owner: National Renewable Energy Lab (NREL)/National Laboratory of the Rockies Architect: HDR Architecture Engineers: AE Design Delivery Method: Bid
Project Highlights
The new 2-story 8,000 SF facility includes a state-of-the-art control room and data center, conference rooms, a 2D visualization room, and support areas along with a detention pond and on-site wastewater treatment system
The center supports the future of clean energy research, monitors and controls integrated energy systems, and interfaces with labs, universities, and research institutions worldwide
The active lab hosts visiting dignitaries and tour groups as well